Research Article
Incorporating a Bayesian Network into Two-Stage Stochastic Programming for Blood Bank Location-Inventory Problem in Case of Disasters
Table 26
The decisions of maximum inventory and emergency stock of the blood bank in the EV solution.
| The prespecified central blood bank: Chengdu |
| Maximum inventory Ciab(U) | Plasma | A | 807.29 | Emergency stock ssiab(U) | Plasma | A | 42 | B | 695.67 | B | 33 | AB | 189.74 | AB | 10 | O | 882.33 | O | 46 | Red blood cells | A | 660.87 | Red blood cells | A | 176 | B | 555.74 | B | 136 | AB | 154.74 | AB | 41 | O | 824.9 | O | 190 | Platelets | A | 237.79 | Platelets | A | 30 | B | 203.26 | B | 23 | AB | 55.63 | AB | 7 | O | 304.89 | O | 33 |
|
|