Research Article

Green Scheduling of Jobs and Flexible Periods of Maintenance in a Two-Machine Flowshop to Minimize Makespan, a Measure of Service Level and Total Energy Consumption

Figure 4

Evolution of the total energy consumption and the makespan, depending on the instances.