Research Article
Experimental Study and Application of Inorganic Solidified Foam Filling Material for Coal Mines
Figure 11
ZMJ-F grouting system: (a) foam, (b) foam slurry, (c) solidified filling material, and (d) inorganic foam filling equipment, including foam slurry production machine, transfer pump, and control system.
(a) |
(b) |
(c) |
(d) |