Research Article
Model Test Study of Rainfall Factors on Failure Process of Xiashu Loess Slope with Gravel Layer
Figure 9
Schematic diagram of slope failure process during intermittent rainfall: (a) the first rainfall, (b) the second rainfall, (c) the third rainfall, and (d) the fourth rainfall.