Research Article

Model Test Study of Rainfall Factors on Failure Process of Xiashu Loess Slope with Gravel Layer

Figure 1

Monitoring instruments: (a) adjustable atomizing nozzle, (b) artificial rainfall system, (c) flowmeter, (d) soil--pressure gauge, (e) signal acquisition instrument, and (f) pore water-pressure gauge.