Research Article

Temperature Control and Crack Prevention Measures for Concrete Ship Locks Subjected to Prolonged Casting Interruptions

Table 3

Computational results of the thermal stresses of one-time placement and layered placement.

Operating conditionMaximum stress (MPa)
Monitoring point Elevation—1.1Monitoring point Elevation—0.8Monitoring point Elevation—0.5Monitoring point Elevation—0.2

One-time placement3.53.53.493.39
Layered placement3.183.112.942.65
Stress differences0.320.390.550.74