Failure Mechanism and Optimization of Arch-Bolt Composite Support for Underground Mining Tunnel

Table 6

The numerical schemes for enhanced support.

Scheme no.Parameters of roadwaySupport type and parametersVertical ground stress (MPa)Lateral ground stress coefficient λ

11The same as Schemes 1∼10CFST arch + Φ22 mm bolts101.5
12CFST arch + Φ18 mm bolts + energy-absorbing bolts on the side walls101.5
13CFST arch + Φ22 mm bolts + locking bolts101.5
14CFST arch + Φ22 mm bolts + locking bolts151.0
15U36 arch + Φ22 mm bolts + locking bolts101.5