Research Article

Failure Mechanism and Optimization of Arch-Bolt Composite Support for Underground Mining Tunnel

Table 1

Test schemes.

Scheme no.Parameters of roadway and supportVertical ground stress (MPa)Lateral ground stress coefficient λ

1Roadway: width 4.4 m, height 3.8 m
Anchor bolt: length 2.2 m, diameter 18 mm, spacing 0.65 m × 0.8 m
CFST arch: square section 150 mm × 8 mm, C40 concrete
2.51.0
25
310
415
520
6100.5
70.75
81.0
91.25
101.5