Research Article

Failure Mechanism and Optimization of Arch-Bolt Composite Support for Underground Mining Tunnel

Figure 3

Result diagrams of Scheme 4 (ground stress 15 MPa). (a)∼(e): Development curves of roadway displacement, arch axial force, arch bending moment, arch supporting force, and rock bolt axial force, respectively; (f)∼(i): diagrams of plastic zone and supporting structure inner force at the 5th day, 10th day, 15th day, and the 20th day, respectively. (Supporting arches and rock bolts are presented as the axial force diagrams; the thicker the line, the greater the axial force. When the line thickness of the bolt axial force diagrams is 0, it means the bolts are broken.)